Sunday, March 7, 2010

Responsibilities and Achievements

- Invited by Managing Contractor to join Integration Team in Spain to support installation of an 1800t Electrical and Instrument Building on Adriatic LNG Project following completion of construction. Primary responsibility waspolo shirts to address interface items between EIB and adjacent modules / GBS deck following installation. Work scope included late modifications and ensuring all final (as built) drawings were completed and submitted to client. This was a valuable experience as it exposed me to working within a major construction company, provided direct daily interface with the client and allowed me to better understand work on very large construction sites- Carry out 3-D steel modelling and prepare design and fabrication drawings of a 1000 tonne 66-Man Living Quarters Module for Su Tu Vang Project. The LQ is to be installed in the float-over deck for Conoco-Phillips in the Cuu Long Field in Vietnam. In addition, I provided mechanical engineeringralph lauren polo shirts
support to the Adriatic LNG project for construction of an 1800t Electrical and Instrument Building. This work was on an as necessary′ basis and was not my primary assignment. - Carry out 3-D steel modelling and prepare fabrication shop drawings for a. Steel roof structure for Raffles Quay Buildingb. Pipe Rack for Singapore Power Plantc. Fusion Polis project for Shimizu Construction Pte Ltdd. Futurecheap ralph lauren polo shirts wall structure for Harbour Front e. BDS Theatre in Singapore
These are steel structures in which company is the fabrication sub-contractor for various main building contractors. The responsibilities also involved in updating all as-built drawings.

No comments:

Post a Comment